Completed Projects

  1. Manchester Road Resurfacing and Bike Lanes

    This project will resurface Manchester Road from Route 109, west to the intersection with Route 100. The project will involve some shoulder widening to provide two 11' driving lanes and two 5' shoulders/bike lanes. Construction is anticipated to begin later this year. Follow this link http://www.cityofwildwood.com/DocumentCenter/View/1801 to view some of the preliminary plans.

  2. Alt Road and Forby Road Intersection

    The City of Eureka has started a project to reconstruct Alt and Forby Roads near the south border of the City of Wildwood. This project will widen Alt Road and Forby Road, re-align the Alt Road/Forby Road intersection, and construct a pedestrian trail along the east edge of Alt Road and the north edge of Forby Road between Wren Meadow Drive and Meramec Boulevard. You can contact GBA Engineers at 636-240-2444 or The City of Eureka at 636-938-5233 with any questions regarding the project.

  3. Route 109 Improvement Project

    Take a look at the Route 109 Improvement Project.

  4. Manchester Road Great Streets Project

    The City of Wildwood has partnered with the Missouri Department of Transportation (MoDOT) and the Cities of Ballwin and Ellisville to make improvements to the Manchester Road/State Route 100 Corridor. These enhancements include the resurfacing of the roadway from State Route 141 to State Route 109, but also many aesthetic, safety, and multi-modal improvements to begin making it a “Great Street.”

  5. 2016 Asphalt Resurfacing

    2016 Asphalt Resurfacing contract to include Alt Road, Allenton Road, Hardt Road, and Eatherton Road.

  6. 2016 Street Slab Replacement

    Street Slab Replacement project for 2016.

  7. Streetscape Extension at Wildwood Crossing

  8. Route 100 Safety Barriers

  9. Manchester Road Streetscape Phase 2

    Find out about the progress being made on Phase 2 of the Manchester Road Streetscape Project.